Highbury Triangle
Client: CMP Construction
Location: Avondale
Plant number: 4,600+
Landscaped area: 8,000m2
Maintenance: 2 years
SCOPE OF WORKS
Designed by Boffa Miskell, this flagship development by Kāinga Ora consists of 236 apartments across five buildings on a 9,433m² site. The goal is to provide a distinctive and recognisable identity for this new community and to generate a sense of pride and sense of individuality in the surrounding environment, encouraging residents to take ownership of their living environment.
VSL Landscapes has been selected to deliver the landscape scope of works for this project.
Vegetation
- Planting
- Lawns
- Raingardens
- Overland flow path
Edging
- Concrete kerbs
- Concrete channels
- Steel edging
- Concrete lawn edging
Furniture/Structures
- Timber bench seats
- Timber picnic tables
- SS Cycle stands
- Raised vegetable planters
- Wheelstops
- Handrails
- Bollards
- Vertical tensile wires
- Aluminium balustrade
- Timber decks
- Suspended walkway
Paving & Surfaces
- Exposed concrete driveway
- Concrete footpath paving
- Asphalt carriageway
- Decorative concrete pavers
- Granite setts
Walls & Fencing
- Timber retaining wall
- Feature entry wall
- Green Screen
- Decorative concrete wall
- Gabion wall
- Aluminium fencing
- Concrete block retaining
- Aluminium gates
- Insitu concrete wall